The first park contains a capacity of two hundred MW even though Sandrini II includes a capability of a hundred MW. The overall expense of the two projects were not disclosed even so, in the course of design, more than 200 staff have been utilized. The tasks are envisioned to https://californiasolarmandate.blogspot.com/2024/11/what-questions-to-ask-solar-companies.html